We've had a productive fall! Beautiful days outside saw the landscaping nearly finished. Our landscaper (and neighbor) Rick and his hard-working boys pulled the dead trees out of the river, got the yard countoured and seeded with grass, and installed the driveway. The driveway is temporary, made of crushed asphalt...the concrete will go in next spring. This past week, our cedar siding was (at long last) installed. We had painters hired to stain the wood, but we decided we better do it ourselves over the weekend because the weather was unusually warm and it'll just get colder after this. We're so happy with how it turned out...hope you like it, too. The garage is another big project nearly finished...we'll show you that soon.
Inside, the wood-burning fireplace provided some much-needed warmth, and looks pretty, too. Rich worked hard for the last few weeks to finish installing the floor heat tubing and put together the water filtering system and water heater. The plumbers come tomorrow to hook everything to the water supply and run the gas pipe, our house will soon be heated!
Next step...getting the basement room finished so we can (maybe) move in! We'll keep you posted.
Monday, November 7, 2011
Saturday, October 15, 2011
Rolling along
We keep rolling along. The landscaping is complete for the year and we only have siding and garage doors to finish outside. We had to change siding contractors because it was dragging on too long. We like the new guy, that should be completed in the next couple of weeks (we hope).
Our neighbor Rick and his crew did the landscaping. We really are happy with how it's turned out. Lots of interesting areas, lots of opportunities for Laura to enjoy gardening.
We are getting up some speed inside too. Larua has the beams (almost) finished, that was a big job of routing, sanding and staining. I've been working on the radiant heating. There is 4500 feet of tubing to install on the bottom of the main floor and I'm almost halfway done. Laura and I are both getting used to sore neck and sholders.
Besides that we have water and septic and an indoor toilet!
Feel free to stop by and chat, we enjoy it. It's interesting that about 1/4 of the people who stop we don't really know... just interested to see it...
Our neighbor Rick and his crew did the landscaping. We really are happy with how it's turned out. Lots of interesting areas, lots of opportunities for Laura to enjoy gardening.
We are getting up some speed inside too. Larua has the beams (almost) finished, that was a big job of routing, sanding and staining. I've been working on the radiant heating. There is 4500 feet of tubing to install on the bottom of the main floor and I'm almost halfway done. Laura and I are both getting used to sore neck and sholders.
Besides that we have water and septic and an indoor toilet!
Feel free to stop by and chat, we enjoy it. It's interesting that about 1/4 of the people who stop we don't really know... just interested to see it...
Sunday, September 25, 2011
September update
We brought (and bought) some very cool tools, including a 57-year-old Delta Unisaw table saw. It purrs like a kitten. (Pictured here standing ready in what will eventually be our bedroom.) Laura spent a week putting a clear finish on the beautiful cedar boards that will eventually line the ceiling. Rich started installing lighting in the basement in preparation to instal the floor heating, wiring, etc, that will soon eminate from the basement. We buned the brisu on the road-side yard so that the septic system can be dug, scheduled to start tomorrow if the weather allows.
The next big project for our contractor Dave will be to have the cedar siding put on the house and after that getting the rooffin completed. Dave's been great; we'll get a picture of him here if we can catch him standing still.
We've also added a photo taken through the front door, from where you see through the house to the river.
Wednesday, August 31, 2011
Progress on the outside
Monday, August 22, 2011
Sunday, August 21, 2011
Another great week
The carpenters are done. They packed up Thursday and took off. There are a few items left on their list, a couple of doors that haven't come in yet, but otherwise it's on to backfill and final grade. That will start Tuesday. Other than that, septic, well, siding, and metal roof. That's about it until Laura and I take over.
Friday, August 12, 2011
Subscribe to:
Posts (Atom)