Sunday, September 25, 2011

September update



So much cool stuff has happened sinc eour last entry. The yard on the river side was graded and seeded with grass, which is already coming up; Rich's detached concrete garage was built; we got locks on the doors, so now we're taking over construction of the inside of the house.
We brought (and bought) some very cool tools, including a 57-year-old Delta Unisaw table saw. It purrs like a kitten. (Pictured here standing ready in what will eventually be our bedroom.) Laura spent a week putting a clear finish on the beautiful cedar boards that will eventually line the ceiling. Rich started installing lighting in the basement in preparation to instal the floor heating, wiring, etc, that will soon eminate from the basement. We buned the brisu on the road-side yard so that the septic system can be dug, scheduled to start tomorrow if the weather allows.
The next big project for our contractor Dave will be to have the cedar siding put on the house and after that getting the rooffin completed. Dave's been great; we'll get a picture of him here if we can catch him standing still.
We've also added a photo taken through the front door, from where you see through the house to the river.







Wednesday, August 31, 2011

Progress on the outside


The work on the outside of the house really progressed today! The concrete floors were poured at the front entry, attached garaged, and screen porch. Also, the forms for the detached garage's concrete walls were constructed, and the two fireplace chimneys were installed. I went out on the river to stay out of the way, and here are a few pictures from that, too, plus a panorama from the riverbank to the house.


Monday, August 22, 2011

A day on the river


I had a great birthday...Rich and I cooked out and had dinner under our own roof for the first time. Very special.
I floated around in a kayak on a beautiful day recently, and here are a few of the things I saw just up the river from our bank.





Sunday, August 21, 2011

Another great week

The carpenters are done.  They packed up Thursday and took off.  There are a few items left on their list, a couple of doors that haven't come in yet, but otherwise it's on to backfill and final grade.  That will start Tuesday.  Other than that, septic, well, siding, and metal roof.  That's about it until Laura and I take over.

Friday, August 12, 2011


This has been such a productive week! The framing is done, ready to install windows on Monday. The carpenters opened the floor to what will become the stairs to the basement. Also, here's a shot of our future basement apartment...the shower tub is in the garage! Come home, Richie, so you can run around in it!





Tuesday, August 9, 2011

The rest of the roof went on today! The roofers will show up to waterproof it tommorrow, I think. The next step is to finish the framing and then install the windows. Our carpenter told me today he thinks they'll only need about another week or so...it's pretty unbelievable. Richie is in the Netherlands, and I can't wait for him to come home and see all the progress on the house.



Sunday, August 7, 2011

Ready to Roof!



On Friday, the wall between the main house and the flat-roofed "annex" was framed. Tomorrow, the roof goes on and wowee, it's almost a house!! Things have really gone quickly the last two weeks...stay tuned for more.